Fair Park Underground Case Study

 

PROBLEM…

Significant heaving from slab to slab.

Approximately 10"-12" Creating hazards for pedestrian and

wheeled traffic.

 

SOLUTION…

The hypothesis was that the grates were rusted and creating

pressure on the slabs. Explortatoryslab removal to identify and

flowing water or unknown variables under the slab.

 

 

 PROCESS & RESULTS…

HSS saw cut to remove the pressure off of the slabs. Removal

of the concrete surrounding the drain. Rebuilt the drains and

replaced/reset the grates.

 

"Your crew was amazing and got the project done on time and re-opened

with a clean garage! ...the project was completed without a hitch!"